Arani Energy
Series A · Live · Target close Q4 2026

Raising €7M Series A.
€40–45M pre-money.

To deliver our first commercial reactor at the Kiviõli Keemiatööstuse (KKT) site, file the international patent family, and scale the commercial team. Dual revenue model — tipping fees on waste destroyed plus H₂ sales — with unit economics that work without subsidy.

Arani Energy two-stage thermal catalytic reactor — engineering render
12 MW commercial unit · Engineering render TRL 6
Round structure

A capital-efficient Series A.

Equity covers first commercial deployment at KKT, IP filing across priority jurisdictions, and team scaling. Non-dilutive instruments stack in parallel to extend runway and de-risk CAPEX.

Item Detail
Round size€7M
Pre-money€40–45M
Investor equity13–15%
StageSeries A · TRL 6
InstrumentPriced equity
Lead profileClimate-tech VC or strategic CVC
First commercial siteKKT, Estonia · MoU signed
Backlog19-unit LOI · ~€150M pipeline
Target closeQ4 2026
Total package to FID
€12M+

Series A equity plus national grant. Non-dilutive instruments stack in parallel post-close.

Series A equity · this round
€7M
Estonian national grant · in review
€5M
EU Innovation Fund Industrial Heat (target)
€5–8M
EIC Accelerator (target, blended)
up to €2.5M
EIB venture debt post-close (target)
up to €10M

Project debt and EBITDA fund subsequent units. No second equity round required until Y3+ cashflow.

Use of proceeds

Every euro maps to a milestone.

Indicative allocation of the €7M equity tranche. Detailed quarter-by-quarter breakdown with milestones available in the data room.

First commercial unit at KKT
~ 50%

Engineering, procurement and commissioning of the first commercial reactor at Kiviõli Keemiatööstuse. SO₂ integration into KKT's existing process. Becomes the bankability reference for unit #2 onward.

Team & operations
~ 30%

Senior commercial hires (Head of BD, Off-take Lead, Permitting Lead), reactor engineering team expansion. Build the operating company for the €150M+ order pipeline.

IP & certification
~ 20%

International patent family filing, independent technical due diligence, RFNBO compliance documentation, hazardous-waste licensing for first deployment.

Why now

The thesis in five lines.

1

Working reactor, not a thesis

TRL 6, validated by Tallinn University of Technology. Mass and energy balance verified. Lab report 9-5-1/273-24, October 2024.

2

Dual revenue, no subsidy required

€300–€800 per tonne tipping fees on waste destroyed plus H₂ sales at €4.5/kg. Base case: €33M revenue / €18M EBITDA per module / year at 55% margin.

3

19-unit LOI · ~€150M pipeline

Estonia's largest energy company committed to 19 units post-FOAK. Signed MoU with Kiviõli Keemiatööstuse for the first host site plus SO₂ integration.

4

Regulatory tailwind

PFAS bans, EU Industrial Emissions Directive, RFNBO Delegated Act, EU Innovation Fund Industrial Heat auction — every regulation tightens our positioning.

5

Capital-efficient roadmap

Modular reactor design (1–12 MW). Series A funds first commercial unit. Project debt, EU Innovation Fund grants, and EIB venture debt stack on top. No second equity round until Y3 cashflow.

Request investor pack

Request the full investor pack.

Send a short message and we'll reply with the deck, the engineering balance summary, and the IP overview. Replies within 1 business day.